Accredited Home Lenders
Supported Windows 2000 upgrade at over 35 financial centers throughout the U.S. This project generated better customer service and improved productivity in the retail centers.
-
Ameriquest Mortgage Company
Converted more than 250 locations across the U.S. to the new corporate WAN infrastructure, which included installing a new router, switch, and Smart-UPS® in each location. This project saved the client an estimated $25–$40 million annually.
-
Ascension Health
Migrated 80 Hospital Ministries to one PeopleSoft ERP system to streamline reporting, business processes and to meet government regulatory mandates. The migration included 60,000 users at seven hospital locations.
-
BAE Systems
Provided 60 secret-cleared resources to perform installation and upgrade activities at 90 locations, including installing and configuring SIPRNet firewalls, Cisco switches, NIPRnet's, Raritan KVMs, mounting of equipment cabinets.
-
Bailiwick - US Bank
Provided Bailiwick with the resources to support equipment installations at 146 U.S. Bank locations in California. Tasks included head-end installations (server, router/switch, UPS), installation/de-installation of teller and platform workstations and photos upon the completion of the tasks.
-
Burlington Coat Factory
Provided the resources and management necessary to open 40 new stores over the course of one year.
-
Calence, LLC
Provided resources at 25 U.S. locations to install the network switch, wireless access points, VoIP phones and then configure them.
-
Capital One Services, Inc.
Supported back office PC refresh project consisting of 1,500 systems at 26 locations in Texas and Louisiana. Through this initiative, new PCs were installed and joined to the network, end-user data was migrated to the new PC, and user/business unit applications were installed. Old PCs were packaged and shipped to our Asset Remarking group to have the data wiped in accordance with DoD standards prior to resell.
-
Container Enterprises, INC - Smurfit Stone
Handled help desk ticket issues within 30 regions across the U.S. and Canada. TEKsystems assembled a team of resources that resulted in higher customer satisfaction rates, increased productivity and a reduction in tickets remaining open for five days or longer.
-
Dell
Supported Loudon County School District consisting of 21 locations and 6,000 assets for systems upgrades and replacements.
-
DHL
Supported 74 locations where we de-installed all equipment, preparing if for shipment. TEKsystems was able to complete all activities within the defined six-week period with no return visits.
-
General Dynamics
Coordinated the logistic requirements associated with ensuring all resources were secret cleared, managed to a predefined schedule, coordinated all necessary travel, provided site status reviews to the Base Commander once all installation/de-installation activities were completed and tested.
-
Harris
Completed project over 15 months, utilizing 22 technicians and four trainers. Each site installation consisted of a site survey, server installations and follow-up support over one to seven days depending on the complexity of the site requirements. All resources were secret cleared.
-
HCA/Healthone
Completed a Windows 7 deployment at eight locations consisting of 1,380 systems over 12 weeks.
-
H E Butt Grocery Company
Supported numerous projects over the past 10 years, including the installation of flat panels, thin clients and upgraded Local Area Network (LAN); replacement of PCs, and new store installations.
-
HP/Domtar
Assisted in migrating from its current Weyerhaeuser infrastructure to Domtar's infrastructure. This entailed migrating DNS, WINS, DHCP, File and print servers, active directory, desktops, Unix Servers and network.
-
HP/State of Colorado
Provided ad hoc resources to perform PC installation and upgrades throughout the state of Colorado over a three-year period. Onboarded resources and provided time management, status reporting on activities completed, travel and schedule coordination.
-
IBM
Performed upgrades for hotel systems including site surveys, new site builds, retrofits of existing hotels, new conversions of hotels, PC upgrades/installations, OS upgrades, server and server rack installations and printers.
-
Jones Lang LaSalle/ADA
Conducted surveys at 253 bank branches across Michigan and Indiana in support of their ADA compliance requirements. Responsible for the data collection, quality control and posting of all project deliverables to client’s website.
-
Jones Lang LaSalle/USPS
Upgraded outdated hardware to improve efficiencies within the Post Office including site survey; installing scanning devices and cradles, Linksys Ethernet switch, PCs, monitors, mouse, keyboards, UPS devices, power strips, printers, a preassembled rack for equipment, and functional testing and asset recovery of the old equipment.
-
Kaplan, Inc.
Enabled Kaplan to request resources for any location throughout the U.S. with minimum notice. Provided Kaplan with flexibility to support requirements without maintaining a team of resources.
-
Kohl's
Installed servers, routers, switches, and PCs including pocket PCs, workstations, printers, scanners, price verifiers, cash registers, electronic signage hardware, RF access points, RF handheld devices, kiosks, UPS, phones and related components, money counters, communication base station and copiers. Services also included software, end-user support, problem resolution and quality assurance.
-
Lenovo
Provided local teams that reduced travel expenses and accommodated a multi-site rollout for 7,740 monitors.
-
Lexmark
Assembled resources to support the surveying and inventorying of 60,000 printers at 434 locations across 125 cities throughout North America. Resources recorded the location and asset information for printers, plotters, copiers, faxes and multi-function printers. Technicians ran a print test on the network printers to collect page print counts and detail printer locations on customer-provided site maps.
-
Lufthansa
Supported Phase 3 of its desktop hardware rollout project involving 40 airport locations. Provided teams and services to support the hardware rollout, asset disposal/remarketing and asset surveys.
-
Microsoft
Supported an XP upgrade for 12,000 PCs at 150 locations across the U.S. TEKsystems utilized local teams while maintaining repeatable processes.
-
Netarx
Provided technical resources to visit 57 sites over an eight-week period to perform a hardware install of a new UPS, router and switch and to take digital photos of the new set up as part of a WAN upgrade.
-
Northwest Farm Credit
Provided cost-effective solution for its national deployment requirements as well as an asset re-marketing component that allowed it to recover funds from outdated assets.
-
Oxy Chemicals
Performed an XP upgrade on 5,000 PCs at 53 sites over an eight-month period. This project enabled the client to stabilize its computing environment on the latest OS platform, reduce trouble tickets, minimize break-fix requirements and meet end-of-life issues.
-
Poudre Valley Health System
Performed PC refresh and XP upgrade services. Project activities included refreshing 225 PCs, upgrading approximately 300 PCs to XP and imaging approximately 150 laptops at sites located throughout Fort Collins, Colorado.
-
SAIC/Marathon Oil
Completed PC upgrade project consisting of 15,000 PCs within North America. The installation and de-installation time frame covered 16 consecutive weeks. Performed hiring, screening, onboarding and project overviews with new hires.
-
Siemens – MetLife
Provided project coordination, methodology and technical resources to de-install and re-install approximately 562 workstations. Responsible for coordinating resources, evaluating and verifying the technical move procedure identifying and training the project team, and monitoring field performance against the project milestones.
-
T-Mobile
Installed RSA 2 Application at 4,000 T-Mobile dealer locations over a four-week period. We averaged 175 technicians in the field per day to complete six sites per day / per resource.
-
Time Warner Cable
Provided weekly status reporting, knowledge management, attrition management and resource onboarding preparation to ensure resources were more productive. Provided Design Coordinators to produce and final design SONT ring plans, cell tower laterals, as builts and splicing to assign fiber pairs.
-
TransCanada
Supported XP deployment that consisted of 1,600 workstations across North America.
-
Wells Fargo
Completed a Token Ring-To-Ethernet conversion of 3,000 devices at 12 locations. Team of 80 technicians was quickly assembled in the local markets.
-
Wyeth Pharmaceuticals
Completed an XP migration of 18,750 desktops at 35 locations. A depot program was configured to support users who did not reside on one of the main campuses to receive, upgrade and ship back to the user.
-
Xerox
Provided a resource-based solution model to support Xerox with a Scanner-Printer Refresh Project at 136 sites across the U.S. for its customer. Technicians uninstalled the old device, installed a new Scanner-Printer and collected inventory data on all print devices.